Projects

Jacalitos Bridge Replacement

March 18, 2015

Myers and Sons Construction LP is the prime contractor on the Jacalitos Bridge Replacement Project. The structure travels over the Jacalitos Creek in Coalinga, CA and will be replaced in two separate stages. The new bridge stands at 43' wide and reaches 137' long over the creek. Water diversions are in place within the creek and slope protection has been installed to keep within the environmental requirements of the project.