Projects

North Sky Trail Bridges

June 27, 2025

Job Number: 0403

As a subcontractor, the scope of work includes the construction of the South and Schneider Bridges. Responsibilities involve excavation and backfill for structures, construction of footings and abutments, installation of anchor bolts and bearing plates, and full construction of the bridge superstructures. This scope excludes the supply of bridge superstructure materials.