The County will replace the existing structurally deficient bridge over Bear Creek with a new, structurally sound bridge. A temporary single-lane detour, previously constructed on the east side of the bridge for an emergency repair project, will remain in place and operational throughout the duration of construction to maintain traffic flow and site access.