Pacific Palisades Emergency
June 27, 2025Job Number: 0455
With unstable slopes directly above an active highway, Myers established K-Rail-protected work zones and a controlled rockfall catchment area while maintaining traffic along PCH. Our field team sequenced high-angle slope scaling, mesh installation, shotcrete application, and retaining wall reconstruction around limited access, equipment positioning, and motorist protection. Integrated drainage improvements relieved hydrostatic pressure, managed runoff, and strengthened long-term slope stability.
Myers coordinated around-the-clock operations, crews, equipment, and materials to complete structural repairs ahead of schedule with zero reported safety incidents.

