Traffic control, repair drainage systems, reconstruct roadway, repair/construct retaining walls, Geotech investigation, subsurface drainage, erosion protection/control, and other items as necessary.
Remove PCC ramp terminal on the north and an approximate 10' of the HMA section south of the sinkhole excavate too competent.
This work includes providing traffic control and performing structural repairs and maintenance as directed by the Engineer. Tasks include cleaning and painting fire-damaged steel members, repairing the steel walkway and... read more →
PCC Slab Replacement
Clean structural steel; spot blast clean and paint undercoat; ultrasonic testing and weld acceptance; paint structural steel; compile final report; provide traffic control and COZEEP.
Replace joint seals and place polyester concrete overlay.
PCC Panel Replacement.
Stabilize the slip out and perform other work as directed by the engineer.
Snow/debris removal, repair slopes and embankments, rock slope scaling, culvert repair and cleaning, minor pavement and striping repair, traffic control, and COZEEP.
Re-paint structural steel, repair bridge deck and wiring, and perform other work as directed by the engineer.