The Route 50/5 Sacramento Design-Build Project was completed in the summer of 2014 across Sacramento and Yolo Counties. This project focused on critical bridge maintenance for two major structures: the... read more →
This three-year project is a Joint Venture between Myers and Sons Construction and Shimmick Construction, aimed at the full rehabilitation and partial widening of the I-710 Freeway from Imperial Highway... read more →
This job involves comprehensive bridge rehabilitation work, including resurfacing the bridge deck, upgrading railings, repairing concrete piers, and restoring the drainage system. Additional tasks include repairing and painting rusted structural... read more →
This job involves the demolition of existing concrete slabs and the placement of rapid strength concrete. Work includes safely removing deteriorated concrete, preparing the area for new placement, and installing... read more →
Replace PCC Slab and Grind PCC Pavement.
Replace Portland Cement Concrete Slabs.
This project focused on rehabilitating the pavement on Interstate 80, extending from just west of the Pedrick Road Overcrossing near Dixon to the Yolo County line, including connector ramps on... read more →
Bridge removal required to install Joint Seal Assembly.
Job involves cleaning the bridge deck using shot blasting equipment. Removes surface contaminants, laitance, and weak concrete to prepare the deck for subsequent treatments or overlays.
Involves saw cutting for Structure Concrete Approach Slab Type R.