Projects

Canyon Road Bridge Replacement

July 19, 2018

Myers and Sons Construction won this contract through the Town of Moraga as a prime contractor. The contract was won at $1.78 million. The scope of work included excavatation for retaining walls and bridges, erection of a prefabricated bridge, 48" CIDH piling, and 63 cubic yards of structural concrete bridge work on abutments for Canyon Road Bridge.