1. Installation of standpipes, valves, and fire cabinets in roadway
2. Installation of a new domestic water line in the plenum to supply potable water from the west portal to the east portal
3. Installation of heat trace for existing and new pipes
4. Scada improvements
5. Upgrades to existing water treatment plant in the east porta