Truckee River Bridge - Constructing a new bridge, grading, paving, striping, installing MGS and removing the existing bridge. A trestle will be needed for construction access and for a temporary road. The work is anticipated to extend over multiple construction seasons. The work seasons will be separated by up to 2 winter suspensions.