MSC will provide all labor, material, and equipment to place polyester concrete overlay up to the depths provided on the contract plans. Additional quantities furnished and installed above the plan depth will be invoiced at the contract unit price.
MSC will prepare bridge deck (shot blast) prior to placing polyester concrete overlay.
MSC will install the PPC Overlay per the manufacture's recommendations and DOT requirements.
MSC will provide labor, material and equipment for the trial overlay. The Prime is to provide a location/surface to place the trial on and is responsible for its removal.
All required bond tests of the new PPC Overlay.
All rolling straight edge testing that is required of the new PPC overlay.