This project conveys highly treated wastewater from a tertiary treatment plant to a regional canal. This initiative represents a collaborative effort among construction and engineering partners to address water supply shortages faced by agricultural customers and to support environmental water deliveries in the surrounding area.An estimated 35,000 acre-feet per year of water will be delivered through conveyance facilities constructed by the joint venture team. The project includes approximately 7 miles of 42-inch diameter pipeline, a 32 MGD pump station, a 2,800-foot horizontally directionally drilled (HDD) crossing of a major river, a 480-foot bore and jack installation beneath a highway and railroad tracks, and an outfall structure at the canal.