Pacific Palisades Emergency

June 27, 2025

Job Number: 0455

The project involves the phased construction of slope stabilization and protective infrastructure. Work includes the placement of K-Rail, installation of slope protection and netting, removal of the existing catchment wall and slope drapery protection system, construction of a new catchment wall with concrete lagging, and reconstruction of the slope drapery protection system. Construction activities will be executed in two distinct phases to ensure safety and minimize disruption.