Projects

SR 99/120 Austin Rd Bridge Replacement

July 16, 2025

Job Number: 0430

Widening the eastbound SR 120 to southbound connector ramp from onelane to two-lanes; removal of the Austin Road Overcrossing and replacing with a new fourlane structure spanning SR 99 and UPRR; adding a new connecting road from Austin Road to East Woodward Avenue and Moffat Boulevard and modify the existing UPRR gated crossing at East Woodward Avenue to conform to the new connector road; modifying the existing northbound Austin Road exit ramp to conform to the higher overcrossing profile grade.