Tim Bell Road Bridge Replacement Project
June 27, 2025
The work includes, but is not limited to, earthwork, grading, roadway construction, drainage improvements, installation of signage and striping, traffic control, clearing and grubbing, tree removal, erosion control, and the installation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Additional tasks include pavement construction, fencing, construction of a new bridge, removal of the existing bridge, and all other related work necessary to complete the project in accordance with the plans and specifications.