Wastewater Treatment Plant Upgrade-Package 1

June 27, 2025

Job Number: 0457

The Package 1 Project involves the demolition and replacement of various components of the existing treatment plant. Key elements of the project include the removal of existing infrastructure such as return sludge pumps, and the installation or upgrade of the following systems: SCADA control system, mixed liquor distribution box, secondary clarifier, return sludge pump station, tertiary filtration system, septage receiving station, and grit and odor control systems. The project also includes all associated piping, valves, controls, electrical systems, roadways, structures, and appurtenances necessary to support a fully functional and modernized treatment facility.