Filter Beds Rehab Project – CMGC

July 15, 2025

Job Number: 0471

Conceptually the design of the Filter Rehabilitation Project includes the following: o Removal of the existing raw water air blower piping and blowers. o Installation of two (2) new air blowers and air scour piping onto the filters o Removal and replacement of existing under drains with new low profile under drains o Removal and replacement of existing influent and backwash troughs with new influent and backwash troughs o Removal and disposal of existing media (the Owner will complete material testing of existing media ahead of Construction Phase) o Structural repair and recoating of the concrete surfaces inside of the filters o Coating of WTP floor surfaces with epoxy coating o Ancillary structural/ mechanical items like recoating work, and sky light replacement.