The Hinton UPRR Overhead seismic retrofit and rehabilitation includes spall repairs, partial removals, infill walls, restrainers, new barriers, fencing, joint seals, and polyester concrete deck overlays. Roadwork will include MGS,... read more →
Truckee River Bridge - Constructing a new bridge, grading, paving, striping, installing MGS and removing the existing bridge. A trestle will be needed for construction access and for a temporary... read more →
Reconstruction of a 4.5 lane-miles interchange, including design and construction of structures, pavement, roadway, traffic management system and ITS field.
The work includes, but is not limited to, earthwork, grading, roadway construction, drainage improvements, installation of signage and striping, traffic control, clearing and grubbing, tree removal, erosion control, and the... read more →
The Phase 1 Project includes the construction of a new four-lane access-controlled expressway, a new interchange at Roselle Avenue, grade separated structures over the Burlington Northern Santa Fe rail line,... read more →
Principal items of work consist of the purchase and installation of a 100’x4’ pedestrian bridge and associated site work.
The Construction Manager at Risk (CMAR) will provide both pre-construction and construction phase services as outlined in Section 3 (CMAR Services). The project involves the demolition of existing concrete bridges,... read more →
Our team was chosen for Caltrans first Progressive Design Build project where we will be retrofitting the Coronado Bay Bridge with a suicide deterrent fence and other bridge upgrades.
The County will replace the existing structurally deficient bridge over Bear Creek with a new, structurally sound bridge. A temporary single-lane detour, previously constructed on the east side of the... read more →
The Contractor shall provide all materials and perform all necessary labor for the construction and installation of a new 70' x 16' bridge at the Colorado State University Mountain Campus.... read more →