Timber Bridge retrofit project on 21 structures location in CDOT Region 2 on CO 9B, US 24A, US 24G, CO 067C, and US 285D.
As a subcontractor, the scope of work includes the construction of the South and Schneider Bridges. Responsibilities involve excavation and backfill for structures, construction of footings and abutments, installation of... read more →
Construct new bridge, remove two bridges, earthwork and paving
This three-year project is a Joint Venture between Myers and Sons Construction and Shimmick Construction, aimed at the full rehabilitation and partial widening of the I-710 Freeway from Imperial Highway... read more →
This project focused on rehabilitating the pavement on Interstate 80, extending from just west of the Pedrick Road Overcrossing near Dixon to the Yolo County line, including connector ramps on... read more →
Bridge removal required to install Joint Seal Assembly.
Job involves cleaning the bridge deck using shot blasting equipment. Removes surface contaminants, laitance, and weak concrete to prepare the deck for subsequent treatments or overlays.
Involves saw cutting for Structure Concrete Approach Slab Type R.
Treat bridge decks remove and replace concrete slabs from freeway panels.
Treat bridge deck with methacrylate resin and replace joint seals.