This project involves the design and installation of a vertical barrier suicide deterrent system, which will be securely affixed to the exterior of the existing bridge railing. To ensure continued access for maintenance and inspection, the project also includes the construction of internal walkways within select bridge superstructure bays. These walkways will provide safe access to areas that will no longer be reachable by an Under Bridge Inspection Truck (UBIT) due to the presence of the new barrier system.
In addition to physical infrastructure enhancements, the project will upgrade the existing closed-circuit television (CCTV) monitoring system. This includes the design and installation of new CCTV cameras to achieve full coverage of the bridge, enhancing safety and operational oversight.