Involves saw cutting for Structure Concrete Approach Slab Type R.
Treat bridge decks remove and replace concrete slabs from freeway panels.
Treat bridge deck with methacrylate resin and replace joint seals.
Clean structural steel; spot blast clean and paint undercoat; ultrasonic testing and weld acceptance; paint structural steel; compile final report; provide traffic control and COZEEP.
Replace box culvert bridge.
Re-paint structural steel, repair bridge deck and wiring, and perform other work as directed by the engineer.
The project involves temporary and permanent repairs to restore bridge functionality. Temporary measures include shoring at multiple locations and repaving damaged asphalt at the north and south bridge approaches to... read more →
Project shall be all-inclusive, from demolition of road surface, removal of guardrails, bridge deck replacement, paving, and guardrail installation.
The Project improvements include implementing one or two ExpressLanes1 in each direction between I‐405 and I‐605. This Preliminary Drainage Report, in conjunction with the Draft Project Report evaluate two Build... read more →
The project is under construction and consists of Ninyo & Moore | East Garden Grove-Wintersburg Channel, Huntington Beach, California | 211893001 | April 15, 2022the installation of two rows of... read more →