Myers & Sons was awarded this Caltrans contract to rehabilitate the Saratoga Creek Bridge by constructing a new two span steel girder bridge within the spandrel walls and arch barrels... read more →
The Contra Costa Transportation Authority awarded this CMGC Contract to Myers-Shimmick, A Joint Venture. The project includes a 200 foot-long cable stayed bridge with a single support in the median... read more →
Myers & Sons was awarded this $9 million Caltrans contract to widen the Atlantic Street on-ramp and replace the bridge along Route 80 in Roseville, CA.
The scope of this work includes construction of two cast in place concrete slab bridges over Clear Creek; Removal of the existing structures; grading and paving for the new bridge... read more →
Myers & Sons Construction in a Joint Venture with Walsh was awarded a $145 Million Dollar Caltrans Contract for CMGC services for the design and construction of bridge repairs and... read more →
Design and construction of certain supporting toll system infrastructure, including a toll gantry, power and communication conduits, power supply to the tolling gantry and signs, toll signage, structures for future... read more →
The scope of this contract includes replacing concrete bridge decks, concrete barriers, and bridge railings at the Alemany Circle Undercrossing on Route 101 in San Francisco.
Myers and Sons Construction won this contract through Caltrans as a prime contractor. It was won at $26.3 million with 275 working days. The scope of the work includes replacing... read more →
Complete removal and replacement of the Evergreen Lakehouse Bridge over Bear Creek (Structure D-27-MP-070). The replacement bridge is a single span structure with precast (pre-stressed) concrete box girders and abutments... read more →
This project consists of the replacement of the existing reinforced concrete slab bridge along Winding Way, approximately 0.1 mile west of Chicago Avenue, over Chicago Creek with a new 39... read more →