Myers and Sons Construction was a subcontractor to Hansel Phelps/Herzong JV through Caltrans. The scope of work included providing and completing a fully functional "APM Columns" system and constructed (3)... read more →
Myers and Sons Construction won this contract through Stanislaus County as the prime contractor. The project was bid at $11.44 million. The Santa Fe Bridge was built in 1947 and... read more →
Myers and Sons Construction was the subcontractor on this contract to the prime through the City of Roseville. The scope of work includes widening the Woodcreek Oaks Blvd. bridge over South Branch... read more →
Myers and Sons Construction won this contract through the Town of Moraga as a prime contractor. The contract was won at $1.78 million. The scope of work included excavation for... read more →
After a fire had broken out on the Wilson Way Bridge, it was unsafe to drive on. Myers and Sons Construction was tasked with 4 cubic yard of structural concrete repair,... read more →
In 2011, the Engineering Department completed an Arterial Intersection Prioritization Study which listed the Horsetooth Road and College Avenue intersection as a top ranked location for needed safety and operational... read more →
The I-15 Barton Road Interchange Reconstruction is a joint venture project with Myers and Sons Construction and Steve P. Rados Inc. The scope of work includes: construction of a new... read more →
Myers & Sons was selected to perform this work for the McHenry Ave Corridor Improvements Project. The three-year project will replace a bridge that can get congested, mainly with commuters... read more →
This Project requires the installation of micropiles. River flows must be diverted (using cofferdams) to allow these micropiles to be constructed. The bridge has substructure elements that have been rated... read more →
Repair Bridge Deck and restore the bridge load capacity at the undercrossing of Hanford-Armona Road and Highway 198 in Hanford