Repair deteriorating and collapsing retaining wall at PM 18.76, scaling and installing net drapery systems at PM 18.48 and 19.09.
The project involves the phased construction of slope stabilization and protective infrastructure. Work includes the placement of K-Rail, installation of slope protection and netting, removal of the existing catchment wall... read more →
Immediate repairs are necessary to prevent slope failure and further deterioration of the roadway and associated infrastructure. These repairs are critical to mitigating risks to life, property, and public assets,... read more →
Removing the stockpiled slide material (1' minus rocky materials) adjacent to the roadway to the landfill and crushing it down to the acceptable 3/4" minus that the landfill requires.
Major items of work include traffic control, install temporary supports, removal and replacement of the existing deck, and additional work as necessary.
Grind exist concrete pavement and furnish & place polyester concrete inlay.
Repair roadway and culvert damages.
Protect the roadway from erosion caused by storm surge and high tides, replace or reconstruct the RSP, the earth berms on top of the RSP and reconstuct the right shoulder... read more →
This work involves cleaning and painting structural steel, including spot blasting and applying an undercoat, followed by final painting. Additional responsibilities include performing ultrasonic testing and weld acceptance, compiling a... read more →
Repair fire damage and perform other work as directed by the engineer.