Repair deteriorating and collapsing retaining wall at PM 18.76, scaling and installing net drapery systems at PM 18.48 and 19.09.
Bridge repair (K-01-B) on SH 141 MP 85.522. Work includes pier reinforcement, abutment reinforcement, channel armoring, and bridge preventative maintenance.
Sub to Clearwater Construction & Management LLC - Owner Idaho DOT Place PPC overlay up to the depths provided on the contract plans. Preparation of the bridge deck (shot blast)... read more →
Immediate repairs are necessary to prevent slope failure and further deterioration of the roadway and associated infrastructure. These repairs are critical to mitigating risks to life, property, and public assets,... read more →
HMA and RHMA surfacing, deck repair, polyester overlay and join seals.
The North Hollywood to Pasadena Bus Rapid Transit (NoHo to Pasadena BRT) project will establish a 19-mile transit corridor featuring 22 stations, serving as a critical regional connection between the... read more →
This project will encompass MSE Walls and include Rock Mitigation measures on the Million Dollar Highway in Colorado.
Place polyester concrete overlay.
This work involves the full-depth replacement of the bridge deck between girders 2 and 4 in spans 1, 2, and 3.
This project involves the installation of a 4-foot diameter stormwater manhole beneath Soda Creek Road, approximately 350 feet south of Little Bear Creek Road. The new manhole will connect to... read more →