Caltrans awarded this CMGC Contract to Myers-Shimmick, A Joint Venture. Pier footing extensions will be constructed for Pier 3 and Pier 4 in the San Gabriel River on three Bridges:... read more →
Myers & Sons was awarded this Caltrans contract to rehabilitate the Saratoga Creek Bridge by constructing a new two span steel girder bridge within the spandrel walls and arch barrels... read more →
The Contra Costa Transportation Authority awarded this CMGC Contract to Myers-Shimmick, A Joint Venture. The project includes a 200 foot-long cable stayed bridge with a single support in the median... read more →
Myers & Sons Construction in a Joint Venture with Walsh was awarded a $145 Million Dollar Caltrans Contract for CMGC services for the design and construction of bridge repairs and... read more →
Design and construction of certain supporting toll system infrastructure, including a toll gantry, power and communication conduits, power supply to the tolling gantry and signs, toll signage, structures for future... read more →
Myers & Sons was contracted by the City of Napa to design and construct Hillcrest & Silverado Highlands Pump Stations replacement.
Myers & Sons Construction in a Joint Venture with JF Shea was awarded this $63 Million Dollar CMGC Preconstruction and Construction contract by Caltrans District 2. The Yreka Rehab Project... read more →
In 2011, the Engineering Department completed an Arterial Intersection Prioritization Study which listed the Horsetooth Road and College Avenue intersection as a top ranked location for needed safety and operational... read more →
The I-15 Barton Road Interchange Reconstruction is a joint venture project with Myers and Sons Construction and Steve P. Rados Inc. The scope of work includes: construction of a new... read more →
The Hanging Lake Tunnels (HLT) are located at MP 125 on Interstate I-70. The facility was completed and opened to traffic in 1992. Each tunnel consists of two lanes and... read more →