This work shall consist of the major concrete, riprap and other structural repairs to I-17-FM. All work other than waterproofing and HMA overlay shall be completed on this structure during... read more  →        
        
    
        	Removal and disposal of existing asphalt-filled corrugated metal deck, bridge rails, rail transitions, and portions of the existing sheet pile abutments.        
        
    
        	Constructing a new 3 span CIP/PS slab bridge and channel lining. All bridge supports utilize cast-in-drilled-hole concrete piles. A temporary water diversion, concrete and metal bridge barriers/rails, and various utility... read more  →        
        
    
        	Consisting of highway and bridge construction or maintenance consisting of removing timber deck and replacing with a steel plank deck and installing a sister beam between timber stringers.        
        
    
        	The City of Woodland’s (City) project will construct a new pedestrian overcrossing starting at Sports Park Drive and heading east over the existing State Route (SR) 113. This project will... read more  →        
        
    
        	HMA, structural concrete, CIDH piling and rebar.        
        
    
        	Structural concrete, bridge removal (portions), and concrete barrier.        
        
    
        	Myers and Sons was hired as a subcontractor to build a 200 foot long, 11 foot wide pedestrian bridge for the California State University San Marcos campus over Barham Drive.... read more  →        
        
    
        	Caltrans awarded this CMGC Contract to Myers-Shimmick, A Joint Venture. Pier footing extensions will be constructed for Pier 3 and Pier 4 in the San Gabriel River on three Bridges:... read more  →        
        
    
        	Myers & Sons was awarded this emergency contract with Caltrans to repair structural fire damage at 16th Ave overcrossing along Route 880 in Alameda County.