Del Valle Dam Outlet Structure Bulkhead Installation and Removal and Storage Rack Construction consists of inspection and refurbishment of Department-furnished bulkhead gate, including the replacement of rubber “J” seals and... read more →
Provide Construction Manager General Contractor (CMGC) services (Services) for the Mountain View Transit Center Grade Separation and Access Project (Project). The Agency, subject to Board of Directors' Approval, intends to... read more →
Stabilize the slip out and perform other work as directed by the engineer.
Middle Mile Broadband Project installing infrastructure for fiber optic cables and hubbs.
Snow/debris removal, repair slopes and embankments, rock slope scaling, culvert repair and cleaning, minor pavement and striping repair, traffic control, and COZEEP.
Includes 220 lineal feet of concrete pedestrian underpasses, 9 site retaining walls, 7 landscape walls, 1605 lineal feet of trails/sidewalks, storm-drain network, traffic signal improvements, temporary and final roadway construction,... read more →
Middle Mile Broadband Project installing infrastructure for fiber optic cables and hubbs.
1. Installation of standpipes, valves, and fire cabinets in roadway 2. Installation of a new domestic water line in the plenum to supply potable water from the west portal to... read more →
Myers and Sons Construction was responsible for placing 1230 cubic yards of jointed plain concrete pavement, 833 cubic yards of structural approach slab, 469 linear feet of bridge deck joints,... read more →
Myers & Sons, in a Joint Venture with R.L. Wadsworth, was granted this contract to Remove talus and install cable net drapery system.