Heavy Civil

Myers and Sons Construction

APM Column Construction

Myers and Sons Construction was a subcontractor to Hansel Phelps/Herzong JV through Caltrans. The scope of work included providing and completing a fully functional "APM Columns" system and constructed (3)... read more →
  • July 19, 2018
  • myers_insight

Santa Fe Ave. Bridge Replacement

Myers and Sons Construction won this contract through Stanislaus County as the prime contractor. The project was bid at $11.44 million. The Santa Fe Bridge was built in 1947 and... read more →
  • July 19, 2018
  • myers_insight

SH 12 Scour Critical Structure

Myers and Sons Construction won this contract as the prime contractor through the Colorado Department of Transportation. The project was bid at $1.12 million with 166 calendar days. The scope... read more →
  • July 19, 2018
  • myers_insight

Highway 49 Soldier Pile Emergency Work

Due to unfavorable weather conditions, emergency work was needed along Highway 49 in Sierra, CA. Myers and Sons Construction's scope of work included construction of soldier pile walls near Downieville. This... read more →
  • July 17, 2018
  • myers_insight

Quebec/Lincoln University Intersection

This project took place in Douglas, Colorado and was contracted out through the Colorado Department of Transportation. The job was won at $2.2 million dollars and is estimated to take 180... read more →
  • July 17, 2018
  • myers_insight

Mesa Water Treatmant Plant Phase 1 Upgrades

The Mesa WTP Phase 1 Upgrades are needed to address aging infrastructure, increased local water use, and extend the service life of the existing 43 million gallons per day (mgd)... read more →
  • July 17, 2018
  • myers_insight

Tulare Water Storage Tanks

Myers and Sons Construction was is responsible for the building of  two new 2.0 million gallon prestressed concrete water storage tanks, installing the electircal building and booster pump station, furnishing and placing a standby... read more →
  • July 17, 2018
  • myers_insight

HWY 50 Bridal Veil Falls Emergency

A portion of Highway 50 in the Sierra was shut down after part of the road buckled, causing the shoulder to collapse. The westbound shoulder completely collapsed, and the No. 2... read more →
  • July 17, 2018
  • myers_insight

North Valley Regional Recycled Water Program

The North Valley Regional Recycled Water Program (NVRRWP) conveys highly-treated wastewater from the City of Modesto’s tertiary treatment plant to the Delta Mendota Canal (DMC). Myers and Sons Construction teamed... read more →
  • July 12, 2018
  • myers_insight

I-70 Hanging Lake Tunnel Retrofit CMGC

The Hanging Lake Tunnels (HLT) are located at MP 125 on Interstate I-70. The facility was completed and opened to traffic in 1992. Each tunnel consists of two lanes and... read more →
  • March 18, 2016
  • myers_insight
  • 1
  • 2
  • 3
  • 4

« Previous Page — Next Page »

Quick Links

  • Our Vision
  • Services
  • Projects
  • Partners
  • Media & Recognition
  • Join Our Team
  • facebook icon
  • instagram icon
  • linkedin icon
  • twitter icon
Contact

California

9033 Washington Blvd
Pico Rivera, CA 90660
Phone: (424) 646-4600 Fax: (424) 227-3286

Northern California

45 Morrison Ave.
Sacramento, CA 95838
Phone:(916) 283-9950 Fax:(916) 614-9520

Colorado

12700 East 168th Avenue
Brighton, CO 80601
Phone:(303) 802-5834 Fax:(303) 802-5836
2025 © Copyright. Myers & Sons. All Rights Reserved. Website designed by Insight Designs | Privacy Policy | Accessibility Statement