Improvements consist of a wastewater treatment facility including an influent pump station, equalization basin, headworks with flow meter, screen and grit removal, intermediate pump stations, bioreactors, aeration blowers, membrane reactors,... read more →
The project includes installing four new 700 HP pumps, rewinding two existing 400 HP pumps, replacing electrical power systems, installing new instrumentation, replacing gate operators, installing new actuators at the... read more →
The project consists of replacement of three sand trap traveling bridges located at Metropolitan’s Hinds, Eagle Mountain, and Iron Mountain Pumping Plants, and includes demolition of existing traveling bridges, construction... read more →
The Blower Replacement Project involves replacing three existing air blowers and modifying the air distribution system. The scope includes replacing air headers with single designated aeration headers to aeration basins... read more →
This project involves new construction in three areas of an existing wastewater treatment plant. The scope includes additions to the Pre-Anoxic Basins, Blower and Aeration Improvements to the existing Oxidation... read more →
Myers was selected by the Calavares County Water District for the Copper Cove Sewer Lift Station project consisting of furnishing and installing a fiberglass wet well, two 75-hp submersible pumps,... read more →
Myers & Sons was awarded this project by the Linda County Water District. The project consists of structural concrete infrastructure work including construction of a new digester, chemical injection and... read more →
Selected by DN Tanks as a Sub-Contractor for the Siesmic Upgrade of the Boronda Reservoir, Owned by the City of Palo Alto. Myers scope of work includes excavation and backfill,... read more →
Myers performed work within the Headworks consisting of the replacement of three horizontal chopper centrifugal pumps, demolition of existing and construction of new pump pads, modification of existing suction and... read more →
Myers was selected by Harbor View Mutual Water Company as the prime contractor for the construction of the new Harbor View WTP. The work included construction of a new facilities... read more →